Emphasis Preaching Journal
In the 1970s a new...
Illustration
In the 1970s a new bridge was being erected over the Ohio River at Cincinnati. The pieces were brought from their respective manufacturing plants and neatly laid out by the river bank. Each piece had been meticulously made and was now ready for placement in the bridge. According to the blueprints each piece had a special place. As they were needed each piece was fitted into the construction. The bridge went up as planned. The pieces did their job in completing their designer's plans. What was once only on a drawing board was now a reality. -- Watson
